Business & Economy ยท Morocco
Morocco Inaugurates $5.5 Billion Nador West Med Port to Ease Pressure on Tanger Med
Morocco inaugurated the Nador West Med port on 31 October 2026, a project costing nearly $5.5 billion. With capacity for over five million containers and a planned LNG terminal, it is meant to relieve congestion at Tanger Med, which has been strained since the Strait of Hormuz disruption.
Morocco has inaugurated the new Nador West Med port on its Mediterranean coast, a project that cost close to $5.5 billion. The opening took place on Saturday 31 October 2026.
The facility is intended to ease pressure on the port of Tanger Med, which has been overwhelmed by container traffic. The congestion has worsened since the start of the Strait of Hormuz crisis, as the Strait of Gibraltar has become one of the main passages for vessels routing around Africa. Tanger Med has continued to post record container volumes while also becoming saturated.
Nador West Med has a total capacity of more than five million containers. It is also set to include a liquefied natural gas (LNG) terminal, which would be a first for Morocco.
Yann Alix, delegate general of the Sefacil Foundation and a specialist in port strategy, said the two ports will complement each other. He argued that Tanger Med grew faster than originally planned and described Nador West Med as a continuation of it from a different location. In his view, the LNG terminal reflects Moroccan hopes of further growth in energy flows, and the port is designed as a gateway for trade towards southern Mediterranean Europe. He said it can receive vessels of the size handled at Tanger Med, meaning ships carrying 24,000 containers.
Both projects are considered strategic for the kingdom, where more than 95% of foreign trade moves by sea.
The source does not detail when the port will reach full operation or when the LNG terminal will be ready.